
BMW wind tunnel Munich
At the BMW Group's wind tunnel in Munich, around 6,500 PIN-A-DF-B type PINs were installed on the 13,000 m² façade with different inclines. The thermally fully separated Roof-PINs were attached to the concrete shell, then the insulation was applied (Roof-PINs left out) and the substructure for the visible level out of Alucobond® was attached to the Roof-PINs.